News
27.05.2015

The dynamics of the construction of the residential district LIFE-Botanichesky Sad (Botanical Garden)

Currently the first line of the residential district is under construction. Most recently the first cubic meter of concrete for block 2 has been filled in. Today, the walls of the ground floor are being built here already. At the same time the pit for block 3 and the base plate are being developed. Land cofferdam installation is being completed.




Ru | Eng